Polyurethane resin floor installed at Prima Cheese food production facility

Polyurethane Resin Installed At A Food Production Facility

Prima Cheese was a detailed project. We installed all of the drainages throughout the factory, followed by a fast-curing cementitious screed to falls. Once cured, we installed 6mm heavy-duty polyurethane screeds.

This project is still ongoing as it has been split up into numerous stages to fit around their production.

Case Study Gallery

installed 6mil heavy-duty polyurethane screeds at Prima Cheese food production facility
Polyurethane resin floor installed at Prima Cheese food production facility
Polyurethane resin floor installed at Prima Cheese food production facility

More Case Studies:

Collage of green resin walkways installed at a wind turbine blade factory

Siemens Gamesa

Read More >
New anti-static floor installed at Jotun Paint's factory by Northern Star Flooring

Jotun Paints

Read More >