Seabrooks

Case Study

Client:

Seabrooks

Location:

Leeds

Date:

December 2018

Seabrooks Crisps head office, revamped by Northern Star Flooring

Seabrooks Revamp

Seabrooks approached us to refurbish their walls in their main product hall.

Their existing tiled walls were looking dull and de-bonding in places.

We removed all existing tiles, rendered the walls using a polymer modified high strength wall render, then installed a fibreglass walling system creating a jet washable hygienic surface with an extended life expectancy.

Case Study Gallery

Seabrooks Crisps head office, revamped by Northern Star Flooring
Two contractors shaking hands
Refurbished wall

More Case Studies:

Polyurethane resin floor installed at Prima Cheese food production facility

Prima Cheese

Read More >
Freshly applied blue and buff resin floor in an aircraft hangar

Cotswold Airport

Read More >
Red resin floor with yellow markings in a coach maintenance workshop

Falcon Coaches

Read More >