Client:

Sedamyl

Surface Area:

1,800m2

Location:

Selby

Date:

March 2023

Sedamyl Glucose Building Case Study

Project Overview

Northern Star Flooring Ltd. was commissioned as food-safe flooring installers at Sedamyl’s Glucose Building. The project involved covering an extensive 1,800m² area with a robust flooring solution capable of withstanding the rigorous demands of an industrial food-processing environment.

Challenges

  • Ensuring the correct falls for drainage across a large surface area.
  • Working within an operational site with strict health and safety requirements.
  • Achieving a durable, slip-resistant, and hygienic finish suitable for food production.

Solution & Execution

To meet the project requirements, Northern Star Flooring Ltd. implemented a two-step flooring system:

  1. Polymer Screed to Falls: The first phase involved installing a polymer screed to create the necessary gradient for efficient drainage. This ensured compliance with hygiene and safety regulations by preventing water accumulation.
  2. Sherwin Williams Polyurethane Screed TG69: The final surface was finished with an installation of heavy-duty polyurethane screed. We chose to use Sherwin Williams TG69 due to its durability, chemical resistance, and anti-slip properties. This system was chosen for its ability to withstand heavy foot and vehicle traffic, as well as exposure to chemicals and cleaning processes.

Outcome

  • A seamless, hard-wearing surface capable of long-term performance.
  • Enhanced safety with improved slip resistance and effective drainage.
  • Compliance with industry hygiene and operational standards.
  • Minimal disruption to ongoing operations during the project.

Conclusion

The successful completion of the Sedamyl Glucose Building flooring project demonstrates Northern Star Flooring Ltd.’s expertise in delivering high-quality, tailored resin flooring solutions. By implementing a strategic approach and using industry-leading materials, the project was completed within the two-month timeframe, ensuring a durable and efficient flooring system for the client.

Case Study Gallery

Flooring installation at Sedamyl’s site
installed a polymer screed
installed Sherwin Williams TG69 - a heavy-duty polyurethane screed
installed heavy-duty polyurethane screed to withstand heavy foot and vehicle traffic
Flooring preparation before new industrial flooring system installed

More Case Studies:

Used Vanguard HD paint system capable of enduring heavy duty traffic with a gloss finish

TCL Packaging

Read More >
industrial flooring solutions provided at Finlay’s factory

Finlay’s

Read More >
Industrial flooring solutions for Enfinium

Enfinium

Read More >